back to list

Symprobe Two-Wire Capacitance Level Transmitter

Introducing Symprobe™ Two-Wire Capacitance Level Transmitter

Application
The general purpose two-wire capacitance transmitter provides contact level measurement up to 10' or 3m, and is ideally suited for clean, water-based, non-coating corrosive liquids with constant chemistry. The transmitter is typically selected for pressurized day tank and process vessel applications. Media examples include nitric and hydrochloric acid.
Flowline deltaspantechtip
Features
 
  FEP probe for use with highly corrosive acid solutions
  Self grounding probe does not require reference in plastic tanks
  Easy potentiometer calibration with power LED and span invert switch
  Small probe mounts in 3/4" fitting
   
Tech Tip
For remote relay control and indication, package your level transmitter with the LC52-1001 continuous relay controller. The spanable controller features up to three process set points with two relay outputs and an isolated 4-20 mA repeater. Flowline symprobetechtip
Specifications
Range:
1' to 10' (30cm to 3m)
Accuracy:
± 1% of full span
Conductive range:
> 100 microohms
Dielectric range:
> 20 constants
Supply voltage:
14-36 VDC
Signal output:
4-20 mA, two-wire
Calibration:
Potentiometer
Process temp:
F: -40° to 158°
C: -40° to 70°
Pressure:
75 psi (5 bar)
Enclosure rating:
NEMA 4X (IP65)
Probe material
FEP
Conduit:
1/2" NPT
Process mount:
3/4" NPT (3/4" G)
Classification:
General purpose
 
Flowline symprobeapp
Part Numbers

Comments
(Please login/register to leave a comment)
Back to Top