back to list

Ricochet Two-Wire Alphasonic Level Transmitter

Ricochet™ Two-Wire Alphasonic Level Transmitter


Flowline ricochetmain
Application
The general purpose two-wire ultrasonic transmitter provides non-contact level measurement up to 12' or 3.7 m, and is well suited for corrosive or ultrapure liquids. The transmitter is typically selected for light duty atmospheric day tank and process vessel applications. Media examples include ultrapure water, potable water and brine solutions.
Features
  Simple compact sensor with fixed span and LED status indicator
  Two measurement ranges up to 3.7m with 3/4" and 2" transducers
  EasyCal simple push button calibration for all user set points
  PP enclosure rated NEMA 4X with rugged PVDF transducer
  Fail-safe intelligence with diagnostic feedback for easy troubleshooting
Tech Tip
For level measurement and control, package the transmitter with our universal panel meter. The panel meter is powered by 120 or 240 VAC and provides loop power for the transmitter. The meter features 2 or 4 relays with an isolated 4-20 mA repeater. Flowline ricochettech
 
Specifications
Range:
LA15: 3.6" to 6' (9cm to 1.8m)
LA20: 6" to 12' (15cm to 3.7m)
Accuracy:
± 0.25% of span in air
Supply voltage:
12-36 VDC
Signal output:
4-20 mA, two-wire
Calibration:
None, fixed range
Process temp:
F: -40° to 140°
C: -40° to 60°
Pressure:
Atmospheric
Enclosure rating:
NEMA 4X (IP65)
Probe material:
PVC, PP or PVDF
Conduit:
1/2" NPT
Process mount:
LA15: 3/4" NPT (3/4" G)
LA20: 2" NPT (2" G)
Classification:
General purpose
     
Flowline ricochetapp
Part Numbers

Comments
(Please login/register to leave a comment)
Back to Top