EchoTouch Three-Wire Ultrasonic Level Transmitter

Introducing EchoTouch™ Three-Wire Ultrasonic Level Transmitter

flowline echotouch3main
Application
The general purpose three-wire ultrasonic transmitter provides non-contact level measurement up to 24' or 7.4m with an internal relay that can be configured as a single-point alarm or latched on two points for automatic fill or empty control. The transmitter is ideally suited for challenging corrosive or waste liquids and is typically selected for atmospheric bulk storage and waste sump applications. Media examples include wastewater and resin.
Features
  Integral relay for alarm or automatic fill-empty control
  LED digital display indicates level in inches or centimeters
  EasyCal simple push button calibration for all user set points
  PP enclosure rated NEMA 4X with rugged PVDF transducer
​
Tech Tip
For applications with surface foam, turbulence or limited measurement space, install the transmitter in a 2" stand-pipe. flowline useless
Specifications
Range:
6" to 24.5' (15cm to 7.4m)
Accuracy:
± 0.25% of span
Display type:
LED, 4-digit
Beam cone:
8° conical
Dead band:
6" (15cm)
Supply voltage:
14-36 VDC
Signal output:
4-20 mA, three-wire
Calibration:
Push button
Process temp:
F: -4° to 140°
C: -20° to 60°
Pressure:
30 psi (2 bar)
Conduit:
1/2" NPT
Enclosure rating:
NEMA 4X (IP65)
Process mount:
2" NPT (2" G)
Trans. material
PVDF
Classification:
General purpose
Flowline echotouch3app
Part Numbers