back to list

EchoPod

flowline echosafe banner

Introducing Flowline EchoPod
Now Shipping!

Flowline introduces EchoPod, an innovative level sensor that replaces floats, conductance and pressure sensors that fail due to dirty, sticking and scaling media in a small tanks 49.2" (1.25m) or less. EchoPod, a general purpose sensor, combines non-contact switch, controller and transmitter capabilities in one multi-function sensor. Combining 4 relays, 4-20 mA output and pump/valve control in one small sensor allows EchoPod to be your total solution. Maintenance free, EchoPod reduces tank system hardware through simplicity and consolidation. Additionally, EchoPod is well suited for corrosive and dirty applications with its non-metallic housing and transducer. EchoPod provides a total solution for fluid handling and automation. The time to "Think Small and Win Big" is now, and it's with EchoPod.


flowline echopodspecs flowline echopodspecs
flowline echosafe
flowline echopodspecs flowline echopodspecs flowline echopodspecs

Comments
(Please login/register to leave a comment)
Back to Top