DeltaSpan Two-Wire Pressure Level Transmitter

Instroducing DeltaSpan™ Two-Wire Pressure Level Transmitter

Application
The general purpose two-wire pressure transmitter provides contact level measurement up to 30 psi or 2.0 bar and is ideally suited for relatively clean water, light oil or diluted corrosive liquids. The transmitter is typically selected for underground bulk storage, wet well, open channel or pond applications. Media examples include irrigation water and motor oil.

DeltaSpan Two-Wire Pressure Level Transmitter
Features
  Rugged stainless steel transducer with flexible polyurethane cable
  Optional weight anchors sensor in turbulent or fast moving liquids
  Removable guard protects sensor from damage and process debris
  Optional installation kit for easy wiring termination and process mount
Tech Tip
For integral wiring termination and process mount, order the LD90 installation kit for use with your transmitter. Each kit includes a compact junction box, PP plug fitting and nylon cable connector. Its installation made simple. LD90-1001
Specifications
Range:
LD10: 7.5 psi (0.5 bar)
LD11: 15 psi (1 bar)
LD12: 30 psi (2 bar)
Accuracy:
± 0.25% of span
Supply voltage:
7 to 35 VDC
Signal output:
4-20 mA, two-wire
Calibration:
None, fixed span
Process temp:
F: -5° to 125°
C: -20° to 50°
Burst pressure:
> 35 x full span
Enclosure rating:
NEMA 6 (IP68)
Trans. material:
316 ss & 17-4 PH ss
Cable material:
Polyurethane
Classification
General purpose
 