back to list

Cricket Two-Wire Alphasonic Level Transmitter

Introducing Cricket™ Two-Wire Alphasonic Level Transmitter!

Application
The general purpose two-wire alphasonic transmitter provides light duty level measurement up to 10' or 3m, and is well suited for clean water or non-coating and scaling diluted corrosive liquids. The transmitter is typically selected for atmospheric day tank and process vessel applications. Media examples include potable water and malic acid.

cricketmain
Features
  Low-cost measurement solution for light duty level applications
  PVC, PP or PVDF wave guides may be easily sized in the field
  Wave guide dampens turbulence for accurate measurement in agitation
  Simple potentiometer calibration with power LED and span invert switch
Tech Tip
For easy installation in open tanks, order the adjustable LM50 side mount bracket. The PP bracket bolts directly to the side wall. flowline crickettech
Specifications
Range:
1' to 10' (30cm to 3m)
Accuracy:
± 1% of span in air
Supply voltage:
14-36 VDC
Signal output:
4-20 mA, two-wire
Calibration:
Potentiometer
Process temp:
F: -4° to 140°
C: -20° to 60°
Pressure:
30 psi (2 bar)
Enclosure rating:
NEMA 4X (IP65)
Probe material
PVDF
Conduit:
1/2" NPT
Process mount:
1" NPT (1" G)
Classification:
General purpose
 
flowline cricketapp
Part Numbers

Comments
(Please login/register to leave a comment)
Back to Top